Job: Mansfield Warehouse
Industry:
Warehouse & Distribution
Service(s): Tilt-Up

This project consisted of 130,000 sf Ductilcrete slab on grade, 6” Ductilcrete paving and 54,000 sf of insulated composite tilt-up wall panels. We were about to provide 27 kip load with a 6” Ductilcrete slab that was placed using the Ductilcrete Heidabed system. This allowed us to incorporate the casting slab into the finish slab, saving both time and money without compromising the quality of the finish wearing slab. The composite tilt wall was 10” thick and provide a true R-13 wall assembly. Coupling our expertise with the technology of composite tilt and Ductilcrete floors we provide a class A institutional grade building for a square foot price comparable to lesser quality metal building.